Long Canyon Gold Mine
- Market SectorBig-D Heavy Indust.
- Size72,800 sq. ft.
- Project LocationWells, NV
- CompanyBig-D Heavy Industrial
- Description
Long Canyon Gold Mine
Long Canyon Gold Mine
Big-D Construction was contracted as the Design-Build contractor to lead the complex, multi-phased design and construction of all the facilities and supporting infrastructure for the new Long Canyon Gold Mine. The construction portion of the project included fueling/propane and storage silo pads, leach pond, and construction of 12 pre-engineered metal building structures. The project was completed under budget and ahead of schedule.
Long Canyon Mine Buildings
Administration Building – 16,300-sf
Truck Wash Building – 7,300-sf
Truck Shop Building – 31,000-sf
Geology Lab – 4,600-sf
CIC Process Building – 9,600-sf
CIC Process Admin Building – 1,700-sf
Ambulance Shed – 1,200-sf
Guard Shack – 300-sf
Well Buildings – 200-sf (4 each)